Monday, August 11, 2008
Sunday, May 25, 2008
Wednesday, May 21, 2008
The original box arrives

Ryan and I drove all the way to Dapto to pick this up from an old warehouse
The left hand side of the box had been exposed to water and was mostly rotten
The cables and roaches were removed
Demolition begins

This whole pannel needed to be rebuilt
Adam hard at work

Ryan and I drove all the way to Dapto to pick this up from an old warehouse

The left hand side of the box had been exposed to water and was mostly rotten

The cables and roaches were removed


This whole pannel needed to be rebuilt

Adam hard at work


The rust was removed and all metal parts repainted