Monday, August 11, 2008
Sunday, May 25, 2008
Wednesday, May 21, 2008
The original box arrives
Ryan and I drove all the way to Dapto to pick this up from an old warehouse
The left hand side of the box had been exposed to water and was mostly rotten
The cables and roaches were removedDemolition begins
This whole pannel needed to be rebuilt
Adam hard at work
Ryan and I drove all the way to Dapto to pick this up from an old warehouse
The left hand side of the box had been exposed to water and was mostly rotten
The cables and roaches were removedDemolition begins
This whole pannel needed to be rebuilt
Adam hard at work
The rust was removed and all metal parts repainted
Subscribe to:
Posts (Atom)